Commit graph

211 commits

Author SHA1 Message Date
20639264bd Add project work areas to Kanban and Plan 2026-09-22 21:46:35 +02:00
8452c9d5e7 Show booked days in plan date picker 2026-09-22 21:11:58 +02:00
78fc06555d feat(plan): show work item details and wrap titles 2026-09-22 20:55:22 +02:00
ab81f32cdf perf(board): batch signed-in project summary reads 2026-09-22 20:39:55 +02:00
9778ee09d4 feat(plan): order timeline by dates and priority 2026-09-22 08:35:17 +02:00
a6785f74ee chore(plan): add targeted hosted schema command 2026-09-22 08:30:20 +02:00
48458f495f feat(plan): rebuild collaborative timeline planner 2026-09-22 08:28:41 +02:00
cc2efd1f23 feat(plan): drag + double-click editor on the Gantt bars
Any signed-in user — owner or client_manager — can now edit
dates directly on the Gantt. Three interaction shapes:

- Drag the bar body to move it (both start and target shift
  by the same number of days, snapped to whole UTC days).
- Drag the right edge to resize (target only).
- Double-click any card or subtask bar to open a modal with
  Start + End date inputs, ESC to close, Enter to save.

Both card and subtask rows ship the same affordances. Cards
go through the existing rescheduleCardAction so the
activity-log row keeps recording who moved the date;
subtasks go through a new setSubtaskDatesAction (no audit
row — matches the existing subtask-toggle pattern).

Components touched:
- GanttBar gains canEdit / onMove / onResize / onEditRequest.
- GanttDateEditor is the inline two-input modal.
- ProjectSection forwards four callbacks (card move/resize,
  subtask move/resize) plus onEditRequest.
- GanttPlanView holds the editor's open state and computes
  one shared timeline range across sections.
- GanttClient wraps the view and bridges to the actions.
- /plan/page.tsx renders GanttClient.

Spec §6 amended to move drag from out-of-scope into the
delivered surface.

482/482 unit tests pass (was 471, +11 from bar-math).
Integration plan-gantt tests still pass.
Build clean.
2026-09-22 05:19:19 +02:00
2b01d0e837 feat(plan): bar-math helpers + open reschedule to anyone signed in
Pure helpers for the Gantt's drag/double-click math:

- fractionToDate(fraction, range): what ISO date a fractional
  position in the chart represents, snapped to whole UTC days.
- shiftDatesByFraction: move a bar's start and target by the
  same delta, clamped to the visible range, with start dropped
  when clamping would invert or collapse the span.
- resizeEndToFraction: what the new target date becomes when
  the user drags a right edge.
- moveCardByFraction: alias that produces the action's input
  shape.

11 unit tests cover the corners (no dates set, point bar,
clamping past the right edge, inversion guard).

rescheduleCardAction also drops its owner-only gate. Any
signed-in user — owner or client manager — can move dates
now. PocketBase's existing row-level rules govern which cards
a given user can write (a client manager still only writes
their own client's cards); the activity-log row is unchanged
and attributes the move to the actual user either way.

Adds setSubtaskDatesAction so the same drag/double-click
gestures work on subtask rows. No audit log on subtasks —
matches the existing pattern (subtask toggles don't log).
2026-09-22 05:16:04 +02:00
cc988c66ca feat(card): show scheduled date range next to dated subtasks
When a subtask has start_date or target_date set, the card
detail's checklist row now shows a small '5 Mar → 19 Mar' label
next to the title. Mirrors the Gantt's view of the same data
without duplicating the chart on the card page.

Build clean.
2026-09-21 16:20:57 +02:00
5ff12a4ef0 feat(plan): replace /plan page body with GanttPlanView
The Puzzle + Timeline tabs of Phase 5 are gone. /plan now
renders one ProjectSection per active project. The old
RoadmapStats strip is removed — its only honest count was
'unscheduled', which the section footer already states
per project.

Build clean.
2026-09-21 16:18:08 +02:00
621a1d419a feat(plan): GanttPlanView top-level component
Composes one ProjectSection per section with a single shared
timeline range. Renders the 'Nothing scheduled yet' empty
state when no section has any dated cards or subtasks.
2026-09-21 16:16:40 +02:00
812af63e66 feat(plan): ProjectSection component
One project's Gantt section: header with brand-colour top border,
label column with indented subtask labels, timeline track with
month labels + W1..W4 ticks + today marker, and per-row bars
reusing GanttBar. Flat row array drives both columns so labels
and bars cannot drift apart. Footer counts undated cards and
subtasks.
2026-09-21 16:16:05 +02:00
644843ce0c feat(plan): GanttBar component
Single horizontal bar — same component renders both card bars
(full colour) and subtask bars (same colour, optionally
strikethrough when done). Uses the same TimelineRange as the
header so the bar and the month ticks above it can never
disagree. Keyboard-focusable with a brand-coloured focus ring.
2026-09-21 16:14:09 +02:00
92c2501726 feat(plan): loadPlan loader with pure buildPlanSections helper
New loader returns the sectioned shape the Gantt view needs:

- buildPlanSections (pure): groups cards by project, sorts by
  start_date asc / title, splits subtasks into dated vs undated.
  Five unit tests cover the grouping and sorting rules.
- loadPlan (server-only): one PocketBase trip per collection,
  delegates to buildPlanSections.

471/471 unit tests pass (was 466, +5 new).
2026-09-21 16:13:47 +02:00
a5dc6083dd feat(schema): add cards.assignee and subtask date fields
Three new optional fields, idempotent ensure helpers:

- cards.assignee: free-text label rendered above the card bar
  on the new /plan Gantt. Empty by default.
- subtasks.start_date: ISO date or empty. Lets subtasks appear
  on the Gantt under their parent card with their own duration.
- subtasks.target_date: same, for the bar end.

Live migration confirmed idempotent — first run added the
fields, second run reported both already present.
2026-09-21 16:12:29 +02:00
cab3b98372 chore(plan): pick up Plan Puzzle v1 in-progress work and Forgejo repo-url helper
The branch plan-puzzle-v1-tests had accumulated changes from a
sibling thread (Plan Puzzle v1 backend + frontend) that hadn't
been committed yet, plus a new src/lib/git/repo-url helper used by
the Forgejo ingest path. Pick them all up so the working tree is
clean and the branch reflects everything since its fork.

Files (Plan Puzzle):
  src/app/actions/client-proposal.ts
  src/app/actions/owner-plan.ts
  src/app/actions/reschedule.ts
  src/app/actions/reschedule-helpers.ts (+ test)
  src/components/admin/project-form.tsx
  src/components/roadmap/roadmap-builder.tsx
  src/components/roadmap/timeline-view.tsx
  src/lib/cards/write-with-audit.ts (+ test)
  src/lib/roadmap/timeline.ts (+ test)

New helper:
  src/lib/git/repo-url.ts (+ test)

Verified: npm run build clean, 466/466 unit tests pass.
2026-09-21 14:40:04 +02:00
8e816eed14 fix(admin): also list client-bound Phase 9 links on the project page
The project admin page used to show only the legacy per-project
intake links (Phase 8 shape). After Phase 9 minting moved the
default to per-client links, owners navigating from a project no
longer saw its request link there — only the BackgroundMdEditor and
other panels. They'd find the link on the client admin page but the
project page suddenly looked empty of intake context.

Fix: query links where link.client == this project's client (the
Phase 9 shape) and render them through the existing panel in mode='client'.
The Phase 8 panel stays too — both shapes coexist during the
migration window. Same data, two views.
2026-09-21 14:32:03 +02:00
6cc7ae01f7 feat(admin): delete button on request link
The request-links panel now has a trash button at the far right of
each row. Click it, the link is gone — cascadeDelete on
intake_link_submissions.link removes the daily counters in the same
transaction, and revalidatePath re-renders the panel without the row.

Hard delete, no confirmation: matches the existing Pause/Resume
pattern (no dialog there either). The icon is a Trash2 from
lucide-react; the title attribute is the only label, by design
owner-only surface.

Phase 9 shape: action takes a scope so revalidation hits the
client admin page the panel is mounted on.
2026-09-21 14:17:55 +02:00
e4779c76e0 test(intake): picker integration tests + final cap wiring
Phase 9c. 12 tests covering:
- picker page (multi-project list, single-project redirect,
  zero-projects fallback)
- wizard URL (project-on-client 200, cross-client 404,
  show_in_intake=false 404)
- submission flow (card lands on chosen project's inbox,
  cross-client refused, hostile body fields ignored,
  per-(link, project) cap isolates one project from another)
- Phase 8 backwards compat (per-project link redirects to the
  wizard; the existing Phase 8 submission route still accepts
  Phase 8 links)

Three bridges from the plan:
1. PocketBase stores date as 'YYYY-MM-DD 00:00:00.000Z'; the
   filter must use that form. Passing 'YYYY-MM-DD' silently
   matches zero rows, even though the create succeeds.
2. PocketBase's getFirstListItem returns 404 for a row just
   written by the same admin client; getList works. The helper
   uses getList with perPage=1.
3. PocketBase's read-after-write latency is significant.
   isLinkProjectUsable retries with exponential backoff for
   up to ~2.5s before giving up; bumpDailyCapForProject's
   upsert pattern uses a fallback read+update path if the
   create hits the composite unique index from a peer's
   concurrent write.
2026-09-21 14:09:36 +02:00
f2477701cc feat(intake): wire picker path through action and route
Phase 9b Task 6. intakeStepPublicAction takes optional projectId;
branches on link.client — Phase 9 path runs isLinkProjectUsable
(per-(link, project) cap) and resolveProjectForClient; Phase 8 path
falls through to validateIntakeLinkForStep unchanged. The wizard
component threads projectId from the URL into the action.

POST /api/public/intake verifies the URL's projectId belongs to the
link's client and is opted in; 404 if not, 429 if the
per-(link, project) cap is reached, 201 on success. On success the
bump goes to bumpDailyCapForProject (Phase 9) or the legacy
bumpSubmissionCount (Phase 8).

Phase 8 backwards compat: a per-project link (link.client empty)
goes through the unchanged Phase 8 path; body without projectId
still works on the Phase 8 route.
2026-09-21 13:35:19 +02:00
b1d7abe6f9 feat(intake): wizard page at /intake/[token]/p/[projectId]
Phase 9b Task 5. Verifies the URL's projectId belongs to the link's
client AND is opted in AND is active. Phase 8 URLs (with link.project
set, link.client empty) ignore the URL projectId and use the link's
own — so the Phase 8 wizard URL pattern still works.
2026-09-21 13:33:16 +02:00
b1b982ee34 feat(intake): picker page with single-project redirect + zero-projects fallback
Phase 9b Task 4. The /intake/[token] route is now the picker.
Single-project links redirect straight to the wizard (no extra
click). Zero-projects links show a static 'nothing here yet' page
with no info leakage. Phase 8 backwards compat: a Phase 8 link
(with link.project set, link.client empty) redirects into the
wizard URL using that projectId, so the Phase 8 UX is unchanged.
2026-09-21 13:32:31 +02:00
78c3b9e401 feat(intake-links): picker project list and resolver
Phase 9b Task 3. listPickerProjects reads the public-eligible
projects on a client; resolveProjectForClient checks that a given
projectId belongs to the client and is opted in. Both fail closed
on any DB read error.
2026-09-21 13:31:48 +02:00
34c36eee15 feat(admin): client-bound IntakeLinksPanel
Phase 9b Task 2. Panel takes a mode prop ('project' keeps Phase 8
behaviour; 'client' is the new shape). The Server Action's input
takes an IntakeLinkScope union ({type:'project', projectId} |
{type:'client', clientId}) so revalidatePath hits the right admin
page after every change.

The Phase 8 site ('/admin/projects/[id]') passes mode='project' and
projectId; the Phase 9 site ('/admin/clients/[id]') passes
mode='client' and clientId. Both render the same UI; only the scope
forwarded to the actions differs.
2026-09-21 13:31:21 +02:00
87fa28c4d1 feat(admin): client admin page with project picker toggles
Phase 9b Task 1. /admin/clients/[clientId] shows the client's active
projects with a 'List on request page' toggle next to each. The
existing /admin/clients list now links each client name into the new
page.

Request-links panel placeholder; Task 2 wires the real
<IntakeLinksPanel mode='client'> here.
2026-09-21 13:29:31 +02:00
a2986a11d0 test(intake): per-(link, project) cap infrastructure
Phase 9a Task 6. Three integration tests:
  - schema lands: row inserts with link/project/date/count fields,
    composite unique index is the only constraint (different
    project same link + date is allowed)
  - duplicate (link, project, date) is rejected by the unique index
  - the public route returns a sensible status, never 500, on a
    Phase 9 link (the route will be wired in 9b; 9a only proves
    it does not crash today)

Two bridges from the plan:
  - PocketBase's date field defaults to unique=true; my schema
    fix flipped it via ensureIntakeLinkSubmissionsDateNotUnique.
    The relation and number fields appeared to share the same
    default but getOne()'s response omits the key, so the
    explicit unique=false on those doesn't stick — yet rows with
    the same link and different projects work in practice (the
    composite index does its job). Worth a follow-up if a future
    PocketBase release tightens the default.
  - bumpDailyCapForProject wraps the read-then-create-or-update
    in a retry on the unique constraint to handle PocketBase's
    read-after-write latency window. The cap-isolation property
    is verified end-to-end in 9c.
2026-09-21 13:27:58 +02:00
0c310801b5 feat(admin): 'List on request page' toggle on project page
Phase 9a Task 5. Single switch, owner-only via the Server Action
wired in Task 4. Saves immediately on click; reverts on error so
a transient PB failure can't leave the UI lying. Default off, per
the Phase 9 spec §4.5.
2026-09-21 13:17:45 +02:00
00c70eba8e feat(admin): setProjectShowInIntakeAction
Phase 9a Task 4. Owner-only. Reverts the project admin page so the
new show_in_intake value is visible immediately after save. The
toggle component that calls this lands in Task 5.
2026-09-21 13:17:02 +02:00
b824f02f02 feat(intake-links): per-(link, project) cap read/write
Phase 9a Task 3. isLinkProjectUsable reads today's counter (or
treats no row as 0). bumpDailyCapForProject upserts via the unique
(link, project, date) index. The Phase 8 helpers stay live for the
old shape; Phase 9b's wizard picks which one to call based on
whether the link is per-project (Phase 8) or per-client (Phase 9).
2026-09-21 13:16:38 +02:00
c4cd1e3646 feat(intake-links): per-(link, project) daily-cap pure helpers
Phase 9a Task 2. Four pure helpers: defaultCapFor, isDailyCapReached,
nextCount, computeDateForCounter. 7 unit tests cover the caps
boundary (cap=0 means 'no submissions today'; todayCount === cap
is reached), the count increment, and the local-date format.

Note: project convention puts unit tests next to source
(src/**/*.test.ts), not under tests/unit/. Adjusted from the plan.
2026-09-21 13:15:56 +02:00
eb45fb0168 feat(schema): intake_links.client, projects.show_in_intake, intake_link_submissions
Phase 9a Task 1. Additive only — the Phase 8 shape stays live.
intake_links.project becomes optional so Phase 9 rows can leave it
empty. intake_links.client is the new owner of the link, read by
the picker page in 9b. projects.show_in_intake defaults to false
and is the knob that hides a project from the picker. The new
intake_link_submissions collection tracks the daily counter per
(link, project, date) so the cap applies per project, not per link.

Type additions:
  - ProjectRecord.show_in_intake: boolean
  - IntakeLinkRecord.client: string (Phase 9)
  - new IntakeLinkSubmissionRecord
2026-09-21 13:15:01 +02:00
b02ebb7cf6 fix(intake-public): read request headers via next/headers, not param
Phase 8a Task 7 shipped the headers argument as part of the
Server Action signature. Server Actions serialise their arguments
through Next's RSC protocol, and a Headers instance does not survive
that — it ends up as something with no .get() and the action
explodes with 'headers.get is not a function' the first time the
wizard runs.

Fix: drop the headers parameter from the action and read the
inbound request's headers via next/headers inside the action. The
client component no longer needs to construct a Headers instance
either.

This was caught the first time a real browser hit the wizard — the
integration tests in Task 17 mock the request and never serialised
a Headers through RSC.
2026-09-21 12:17:45 +02:00
2432fff0aa feat(admin): render BackgroundMdEditor on project page
Phase 8c Task 6. Editor sits below the IntakeLinksPanel; the
admin layout already enforces owner-only access.
2026-09-21 11:49:24 +02:00
8551a6f893 feat(admin): background markdown editor with character cap
Phase 8c Task 5. Server Action caps at 40000 chars on write, owner-
only via requireOwner(). Client component: one textarea, live
counter, explicit Save button (no auto-save), repo URL rendered as
a 'see also' link rather than a tool call.
2026-09-21 11:48:56 +02:00
5c6f82cb74 test(intake): background markdown prompt tests and truncation
Phase 8c Task 4. Renames truncateForPrompt →
truncateBackgroundMdForPrompt and exports it for testing. Three
test groups now exist: buildQuestionPrompt, buildBriefPrompt, and
truncateBackgroundMdForPrompt.

The byte-identical test (twice — for question and brief prompts)
is the day-one regression guard: every existing project gets an
empty background_md after the migration, and an empty doc must
produce exactly the prompt the wizard produced yesterday. A diff
here breaks every in-flight interview on the day 8c ships.
2026-09-21 11:48:14 +02:00
4a31b16dd5 feat(intake): per-project background markdown in the wizard prompt
Phase 8c Tasks 2 + 3. IntakeContext gains backgroundMd; intakeContext
in interview.ts reads project.background_md, trims it to the
30000-char prompt cap with a marker. Both prompts add a
'Background on this app (from the developer)' section framed as
the developer's own notes — same 'data, not instructions'
mitigation that already wraps the transcript.
2026-09-21 11:47:22 +02:00
7df7074806 feat(schema): projects.background_md for per-project context
Phase 8c Task 1. Optional text field on projects, max 40000 chars.
The prompt module caps at 30000 with a truncation marker. Empty
documents produce byte-identical prompts to today — the test in
Task 4 locks that in.
2026-09-21 11:44:58 +02:00
4c4dbaf917 feat(pwa): manifest link, theme color and service worker registration
Phase 8b Task 5. Renders <head> pieces through Next's metadata
export (manifest link, apple-touch-icon, appleWebApp) so the root
layout's <html>/<body> stay unowned. The only inline JSX is the
service-worker registration script. Verified: manifest, icon,
sw.js all 200 OK; the intake page emits theme-color, manifest link,
apple-touch-icon and the SW registration script.
2026-09-21 11:26:18 +02:00
c11d378483 fix(intake-links): three PocketBase quirks the schema shipped with
The schema the plan specified had three places where a PocketBase
quirk blocked normal use of intake_links / activity rows. None of
them surfaced in Task 1 because the unit-level test there only
checked rule application, not inserts.

1. intake_links.submission_count and submission_count_today were
   required: true with min: 0. PocketBase treats 0 as blank for
   required number fields, so every insert 400'd. Made optional.
2. intake_links.active was required: true, which rejects false as
   blank (the same quirk). The owner can mint an already-revoked
   link (the test exercises this); made optional.
3. activity.actor was a required relation. The public route writes
   a card_submitted_anonymously row for a submitter who has no user
   account; empty string is not a valid relation. Made optional and
   dropped actor: '' from the route.
2026-09-21 06:30:49 +02:00
4335af4f78 feat(admin): render IntakeLinksPanel on project page
Phase 8a Task 16. The admin layout already enforces owner-only
access. Reads intake_links via getAdminPb, sorts by -created,
passes through to the panel as plain records.
2026-09-21 02:29:30 +02:00
1e976555ef feat(admin): intake links panel with mint, copy, rotate, revoke
Phase 8a Task 15. Owner UI panel: New-link button reveals a label
input; on create the URL is shown once with a Copy button (never
shown in full again — losing the URL does not lose access, the
admin page itself can read it). Per-link Rotate / Revoke /
Re-activate buttons and a private Notes editor (saves on blur).
2026-09-21 02:28:49 +02:00
c29f855ffd feat(intake-links): owner actions for create / rotate / revoke
Phase 8a Task 14. Server Actions are owner-only via requireOwner().
create returns { id, token, url } — the URL is shown to the owner
once, mirroring rotateWebhookSecret. rotate issues a fresh token and
invalidates the old URL immediately. setIntakeLinkActiveAction
covers revoke (active=false). Notes are capped at 1000 chars on
both write paths.
2026-09-21 02:27:45 +02:00
bb78c9b56f feat(card): distinguish anonymous submissions on the card page
Phase 8a Task 13. CardSubmittedBy renders nothing for 'owner',
'Requested' for 'client', and 'Submitted via public link' for
'anonymous'. Renders nothing once the card is accepted. Replaces the
inline client-only check on the card detail page.
2026-09-21 02:27:13 +02:00
07ece87de5 feat(intake): post-submit thanks page
Phase 8a Task 12. Static page; no card read, no brief shown, no
link to the signed-in board. Resolves the token only to confirm it
is still alive — a revoked token landing here still shows 'Thanks'
so the submission cannot be probed.
2026-09-21 02:23:04 +02:00
a3972f5f19 feat(intake): public wizard and brief preview
Phase 8a Task 11. Replaces the Task 10 placeholder with the real
public wizard: Start button → question/answer loop (max 7 questions,
matching IntakeWizard) → public BriefPreview that POSTs to
/api/public/intake and redirects to /intake/[token]/sent/[cardId].
No fallback to the plain request box — an unavailable assistant
shows a static message instead.
2026-09-21 02:22:21 +02:00
a591f352c8 feat(intake): public intake page resolves token to project
Phase 8a Task 10. Server component 404s on unknown/revoked/expired
tokens with the same wording so the response cannot probe token
existence. Only the link's label and the project name cross into
the rendered HTML; counts, notes and the token itself stay
owner-only.

The IntakePublic component is a placeholder — Task 11 replaces it
with the real wizard. Keeping the placeholder lets the build stay
green between the two commits.
2026-09-21 02:21:32 +02:00
5137a6dda2 feat(intake): minimal layout with no app shell
Phase 8a Task 9. The intake route's own layout pulls in no
ThemeScript, no ThemeSync, no Inter font, no globals.css — so the
public route ships without the signed-in app shell.

Deviation from plan: this layout does NOT redefine <html>/<body>.
Next.js App Router requires the root layout to own those; a nested
layout that tries to override them is a build error. The intent
(public route is its own thing, no app shell) is preserved.
2026-09-21 02:20:27 +02:00
4004aecefd feat(api): public intake submission route
Phase 8a Task 8. POST /api/public/intake is the sibling of
/api/client/intake, not a branch: same parseBrief whitelist, same
card-create code path, with created_by_role='anonymous' set in code
(not from the body). 404 for unknown/revoked/expired tokens — same
wording for all three, so the response cannot probe token existence.
Counter bumps are best-effort so a card is never lost to a
counter-update failure.

Deviation from plan: dropped the dead 'tokenHeader' line that the
plan's own comment admits is vestigial.
2026-09-21 02:19:42 +02:00
9081659e20 feat(intake): public Server Action with rate limit and daily cap
Phase 8a Task 7. token-shape check → rate-limit → daily-cap →
resolve. Same InterviewStep return shape as the signed-in action;
the wizard does not branch on which side it is on.
2026-09-21 02:00:16 +02:00