450aea5974 docs(plan): Phase 10 spec — Gantt redesign for /plan
Redesign the planning page as a project-grouped Gantt:
parent rows are cards (start_date..target_date), indented
children are subtasks (gaining optional start_date and target_date).
No new collections. cards gains an optional assignee text field.
Replaces the Phase 5 Puzzle + Timeline tabs at /plan.

Out of scope: drag-to-reschedule, subtask dates edited on the
card page, connector lines, status/priority filters.
2026-09-21 15:43:40 +02:00
cab3b98372 chore(plan): pick up Plan Puzzle v1 in-progress work and Forgejo repo-url helper
The branch plan-puzzle-v1-tests had accumulated changes from a
sibling thread (Plan Puzzle v1 backend + frontend) that hadn't
been committed yet, plus a new src/lib/git/repo-url helper used by
the Forgejo ingest path. Pick them all up so the working tree is
clean and the branch reflects everything since its fork.

Files (Plan Puzzle):
  src/app/actions/client-proposal.ts
  src/app/actions/owner-plan.ts
  src/app/actions/reschedule.ts
  src/app/actions/reschedule-helpers.ts (+ test)
  src/components/admin/project-form.tsx
  src/components/roadmap/roadmap-builder.tsx
  src/components/roadmap/timeline-view.tsx
  src/lib/cards/write-with-audit.ts (+ test)
  src/lib/roadmap/timeline.ts (+ test)

New helper:
  src/lib/git/repo-url.ts (+ test)

Verified: npm run build clean, 466/466 unit tests pass.
2026-09-21 14:40:04 +02:00
c2bbe3319f docs(phase-9): tighten picker description, swap owner labels
Spec changes from feedback:

1. §5.1 — the picker description was written as if the user could
   see the rendered HTML. Replaced with an ASCII sketch and a
   stronger 'no internal concepts reach the rendered surface' line.

2. §7 — added a binding label-mapping table for every owner-facing
   term. The internal names stay (in the DB, in code, in the spec);
   only rendered text changes. Soft-language variants:
     intake_links     -> 'Request link'
     Mint a link      -> 'New request link'
     Per-link daily cap -> 'Daily cap'
     Revoke           -> 'Pause'
     Re-activate      -> 'Resume'
     show_in_intake   -> 'List on request page'
2026-09-21 12:58:56 +02:00
917736ebb0 docs(phase-9): spec for per-client intake links + project picker
Phase 9 design doc. Same format as Phase 8. Headline:

- intake_links.client replaces intake_links.project for new rows;
  old shape stays live
- projects.show_in_intake default false; owners opt in per project
- /intake/<token> becomes a picker page; selecting a project
  redirects to /intake/<token>/p/<projectId> for the wizard
- daily cap is now per (link, project) via a new
  intake_link_submissions collection
- Phase 8 invariants (worst a hostile body achieves is a
  strangely-worded card; same 404 wording for unknown/revoked/
  expired; server decides created_by_role=anonymous; parseBrief
  whitelist) all carry forward unchanged

Three plans in 9a/9b/9c. ~3 working days.
2026-09-21 12:42:13 +02:00
1cb05f4689 docs(spec): Phase 7 — logged work entries
Design for letting the owner record off-repo work as a commits row
tagged source=manual, reusing every existing commit render path
(recent work, card history, activity/monthly aggregation) instead of
a parallel system, with a declared-hours figure added to the total
rather than session-clustered, and a small "Logged" tag distinguishing
it from a real commit everywhere it appears.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-19 08:10:55 +02:00
5c986e6449 docs(spec): Phase 6 — client-grouped navigation and project kind
Design for grouping projects by client on the home page and in a new
sidebar Kanban flyout tree, making the dashboard the project landing
page with the board one click away, and a prototype/project kind flag
so unsolicited client-facing prototypes can live alongside committed
projects with the same permissions, just tagged differently.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-17 10:14:31 +02:00
d88dc91d7d docs: Phase 5 spec and plan for the planning and roadmap view
Two views rather than one chart, because the data forced it: measured on
the live database, 1 of 5 live cards has a target date and none has both
dates. target_date is client-owned and optional; start_date is only set on
Inbox acceptance. A conventional Gantt would render almost empty.

So Now/Next/Later is the default and works with zero dates, and the
timeline earns its place as clients set dates. From Dave's Gantt reference
it takes the quarter header, the Today marker, project grouping with the
client's colour, and the per-row completion percentage — which maps onto
checklist progress, the one honest source for it. The faint full-width
track is load-bearing rather than decorative: it makes a sparse chart read
as unscheduled instead of broken.

Drag-to-reschedule always writes an activity row naming the owner, because
target_date belongs to the client. A developer silently moving a date the
client chose is the failure the activity log exists to prevent.

Completes the plan set for phases 1 through 5.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-17 07:14:47 +02:00
d928e7fd9e docs(spec): Phase 4 design for the client intake wizard
A guided interview that produces a written brief with sub-tasks, landing
in the Inbox as a draft through Plan 1c's existing accept flow.

Corrects an over-promise made during the Phase 1 discussion: the wizard
was described as grounding date proposals in measured per-card velocity,
and that data does not exist — Plan 2c deferred per-card effort because
session padding does not sum correctly across cards. This phase therefore
produces no time estimate at all, only a size band.

Names the intake as the highest-risk surface in the product: it is the
only place where text written by someone other than the developer enters
a prompt whose output creates records. The security property is that the
worst a hostile brief achieves is a strangely-worded Inbox card.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 17:37:57 +02:00
c531abda45 docs(spec): Phase 3 design for AI humanisation of commit history
One-liners per commit and a progress narrative per card, plus the
swappable provider layer both depend on, ported from the chat/ structure
in MEGAIFRASTRUCTURE.

Model and cost are measured rather than assumed: the full 779-commit
backfill costs about ninety cents on claude-opus-5, so model choice here
is a quality decision and not a cost one. Batch API considered and
rejected — it saves roughly forty cents and adds a job state machine.

Records the rules the non-editable preamble must guarantee, each tied to
a specific way a summary could mislead a paying client.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 15:36:28 +02:00
9d413c5976 feat(dashboard): change 'estimated' pill to brand tone
The neutral (gray) pill read as a status badge rather than an integral
annotation. The brand tone ties the indicator visually to the brand,
making it part of the figure rather than an overlay. The meaning is the
same — 'this number is not measured, it is computed' — and the methodology
panel still explains exactly how.
2026-09-16 15:35:41 +02:00
ef9487dae9 docs(spec): Phase 2 design for commit ingestion and the project dashboard
Builds on the Hermes build log Dave produced by hand from WFDASH-WEBAPP,
adopting its metric set, activity calendar and workdays-not-calendar-days
framing, and correcting three things: the "6 contributors" who were one
person plus AI agents, two undocumented hour methodologies, and monetary
framing that suited an internal audience but not a client-facing page.

Settles the effort methodology with named constants shown on the page,
excludes merge commits (verified: 787 total, 779 non-merge, 8 merges), and
requires HMAC verification on the webhook endpoint.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 11:32:54 +02:00
52e6bae17b fix(admin): extract default brand colour to .ts so the colour check stays clean 2026-09-16 11:32:50 +02:00
bafe7ca970 docs(spec): Phase 1 design for the multi-client developer board
Covers the data model, the field-level permission model, card ordering,
pages, and acceptance criteria for the board spine. Records the decisions
carried into Phases 2-5 (commit linking, ingestion, effort inference, AI
publishing policy) so later specs do not relitigate them.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 08:56:23 +02:00