Dave c2eabe1cfc fix(delivery-notes): unblock quoting, and one action set for both screens
Two things stopped the operator quoting a delivery note. Neither was
friction; both were bugs.

1. "The status is not right"
   `createQuoteFromDeliveryNote` opened with `if (dn.status !== "draft")`
   and refused everything else. A note the office had already sent, or
   that the customer had put a PO against, could not be quoted at all,
   and the whole error message was that condition.

   Now any status except `cancelled` can be quoted — cancelled is the
   one genuinely unquotable state, because the work was abandoned and
   pricing it would put dead goods on a customer-facing document.

   Critically, the status write is now conditional. It used to force
   `sent` on every create, which with a relaxed gate would have dragged
   a po_received note BACKWARDS to sent and erased the fact that the
   customer had sent their PO. Pricing a note is not a reason to move
   it. The detail page's Create quote button was also `draft`-only and
   now matches the server.

2. "It needs a supplier and this and that"
   The quote was being created fine — the PDF was refusing to render.
   The readiness check required four things per line, and the two the
   modal already supplied were the only two that were satisfiable:

   - `is_processed` was never set on a delivery-note quote, and
     NOTHING could set it: the quote_items update whitelists exclude
     it, and the only writer was /quotes/[id]/process. So a DN-created
     quote could not produce a PDF without leaving the flow entirely.
     It now derives from the confirmed pricing — cost AND selling
     both present — the same rule the process page uses. A line the
     operator left unpriced still blocks, so the check keeps its teeth.
   - The supplier block is gone. A counter note has no parent order,
     so its lines frequently carry no supplier; demanding one refused
     the PDF for a field the counter form never asked for. The
     supplier is still printed when present.

Signed copy is never a completion signal. The upload route only ever
wrote `signed_copy` — nothing was writing `completed` — and that is now
pinned by a test asserting create-quote never sets `completed` for any
input status, so the relaxed gate cannot introduce it.

One action set, not two
The list and the detail page each hand-wrote the same action set and
had drifted twice: the list got a pricing-review modal the detail page
never received; the detail page got Mark complete, Cancel, Download /
Regenerate PDF and Upload signed that the list never received. The
status gates drifted with them.

`DeliveryNoteActions` now owns the set, the order and the gating. Both
pages render it — icons on the list, labelled buttons on the detail —
and each supplies its own handlers, so behaviour stays where the state
lives but "which buttons, and when" is answered in one place. An
action with no handler is not rendered, so neither presentation can
invent or hide one.

Tests: 27 new. 19 pin the action set and gating, 8 cover the relaxed
gate / no-backwards / is_processed / no-supplier rules. Verified they
bite by regressing create-quote to draft-only and by restoring the
old supplier block. Full suite 3670 passing, tsc clean, no new lint
warnings.
2026-10-05 15:27:39 +02:00
..
counter
dashboard
invoicing fix(pdf): render through renderToBuffer, not pdf().toString() 2026-10-04 13:14:59 +02:00
mcp fix(mcp): validate set_pricing actor and row ids; tighten pricing prompt 2026-10-01 01:09:43 +02:00
tv
v1 fix(delivery-notes): unblock quoting, and one action set for both screens 2026-10-05 15:27:39 +02:00