kanban-dev-webapp/docs/superpowers
Dave 882e9e20a7 docs(phase-9c): plan for picker integration tests + verification
Two tasks. Same format as 8c.

Task 1 — tests/integration/intake-picker.test.ts mirrors the Phase 8
shape. Five describe groups:
  - picker page (multi-project list, single-project redirect,
    zero-projects fallback)
  - wizard URL (cross-client projectId 404, show_in_intake=false 404)
  - submission flow (card lands on chosen project's inbox,
    cross-client refused, hostile body cannot override server-set
    fields, per-project cap isolates)
  - Phase 8 backwards compat (per-project link still resolves through
    the picker to the wizard URL)

Task 2 — full verification: unit, integration, build, colour
check, manual walkthrough, Phase 8 backwards-compat walkthrough.
2026-09-21 13:12:44 +02:00
..
plans docs(phase-9c): plan for picker integration tests + verification 2026-09-21 13:12:44 +02:00
specs docs(phase-9): tighten picker description, swap owner labels 2026-09-21 12:58:56 +02:00