0c4bbd951f docs(plan): Phase 4a and 4b for the client intake wizard
4a builds the stateless interview. Every constraint that matters is
enforced in code rather than requested in the prompt: the seven-question
cap, the answer length, and what fields a brief may contain. parseBrief is
a whitelist, not a parser — a brief asserting priority or accepted loses
those at the boundary and they never reach a caller that could act on them.

4b adds a separate intake route rather than extending Plan 1a's client
card route. That route's tests were written against a two-field body;
widening the shape it accepts would leave them passing while proving less.
Both routes set column, priority, accepted and created_by_role themselves,
and both are separately proven to.

The property both plans are written to: the worst a hostile brief can
achieve is a strangely-worded card in the Inbox.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 17:46:54 +02:00
f3e4b30d46 feat(ai): settings storage with a browser-safe projection 2026-09-16 15:52:12 +02:00
44bcc81d97 feat(ai): provider-neutral completion interface 2026-09-16 15:50:39 +02:00
0fd2cef2cf docs(plan): Phase 2b and 2c for commit linking, metrics and the dashboard
2b closes a gap between the spec and the schema: the spec's [#42] explicit
link had nothing to reference, because cards only had PocketBase ids. Adds
per-project card numbers, and sharpens two rules the spec left loose — a
scope rule is bounded by start_date OR created, and ties go to the card
with the latest bound rather than the most recently edited one.

2c builds the dashboard. The South African holiday table is verified
against the Hermes build log: 24 May to 8 Sep 2026 gives 108 calendar days
and 75 workdays, both exact, and that is now a regression test.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 12:52:42 +02:00
3f9bbb783a docs(plan): Phase 2a implementation plan for commit ingestion
Eleven tasks covering conventional-commit parsing, HMAC webhook
verification, the Forgejo client, a shared idempotent ingest core, the
webhook and reconciliation endpoints, and the backfill admin panel.

The Forgejo API shape, pagination headers and merge counts are measured
against the live instance rather than recalled, and the plan says so, so
the implementer builds against facts.

Surfaces one unresolved issue for decision: projects.webhook_secret is
readable by a client manager straight from PocketBase, because rules are
record-level and cannot hide a field.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 11:41:57 +02:00
301af1f739 docs(plan): Phase 1d implementation plan for admin and accounts
Fourteen tasks covering clients, projects, manager accounts, column
management and the archive, so the owner can run the product without the
PocketBase console or the seed script.

Records why account creation must use a superuser connection: the users
write rules are locked because role is an ordinary field there, and both
the signup and self-promotion paths were verified exploitable. Adds a
verification step that re-runs the escalation guard, since this is the
phase most likely to reopen it.

Corrects Plan 1c's deferred list: the AI settings screen belongs to
Phase 3 per spec section 5.3, not here.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 11:24:05 +02:00
0c6557b89d docs(plan): Phase 1c implementation plan for card detail and the Inbox flow
Fourteen tasks covering the card detail page, checklists, comments, a
readable activity timeline, card creation for both roles, and the accept
flow that stamps start_date.

Owner mutations are Server Actions on the caller's own token; client
mutations keep going through the whitelisted /api/client routes. Records
the constraint that activity.createRule is superuser-only, so audit rows
need a dedicated helper even for the owner.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 10:56:53 +02:00
857ef1a994 chore(seed): demo client, project, users and cards 2026-09-16 09:44:19 +02:00
76438f6e90 feat(api): client routes for inbox card creation and comments 2026-09-16 09:44:04 +02:00
72f9de6999 feat(api): client PATCH route for card priority and target date 2026-09-16 09:43:36 +02:00
91e53f150a feat(auth): PocketBase login, logout and signed-out redirect 2026-09-16 09:43:18 +02:00
30c1405f72 feat(activity): derive audit rows from card patches 2026-09-16 09:42:42 +02:00
6a6df8076b feat(cards): positive field whitelist for client-manager writes 2026-09-16 09:42:26 +02:00
ba990f0109 feat(schema): all collections + role-scoped API rules on remote PB
- migrations/ documented in pocketbase/pb_migrations/ for local PB
- scripts/setup-remote.ts applies them via admin API to remote PB
- collections: clients, projects, columns, cards, subtasks, comments, activity, settings
- user extension: role (owner|client_manager), client (relation)
- writes: owner only for app collections, superuser-only for activity and settings
2026-09-16 09:41:20 +02:00
6cfc7ee7cf docs(plan): Phase 1a implementation plan for data layer and permissions
Eighteen tasks, 86 steps, covering the PocketBase schema, auth, the
field-level whitelist that PocketBase rules cannot express, the three
client routes, and all five acceptance tests from the spec.

Board UI is deferred to Plan 1b so the security boundary can be reviewed
on its own rather than inside a large UI diff.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-16 09:20:55 +02:00