Road areas (5,221 m²) in 20 m sections along the ring roads and the Igwali Street spur, 1.74 km of kerb measured once, stand lines, and the four survey benchmarks with an indicative ground plane. No services or ground levels are placed; the supplied survey and sewer sheets cannot yield them.
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Extract 23 stormwater structures / 22 pipes and 18 sewer manholes / 17 pipes with sizes, inverts, ground levels and positions from the C3277 long-section tables (superseded sewer copies dropped by matching the issued PDFs). New model folder 2026-10-21. Map 3 draws them as round pipes and manholes, adds status popups for pipes and manholes, and reuses Map 2's services panel; water stays plan routes.
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
- Sites → Maps in the sidebar replaces the per-site Site map / Map 2 links.
The Maps page shows each site's model as a plan preview (built sections
solid) with % of road layerworks built and links to Site map and Map 2.
- Double-clicking a road section opens its progress tick-boxes over the map
(Site map saves to the server; Map 2 stays a local scenario).
- Cedar Gate: 40 drawn cross-sections extracted from C3277-912-001 Rev A
(extract_cedar_gate_xs.py), cut/fill limited to Cedar Gate Road, a Cut &
fill workspace in Map 2 with a chainage chart, and pavement layers shown
in their material colours.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Add planned vs actual turnover dashboards, monthly actual costs, editable retention forecasts and actuals, starting retention, payouts and running balances. Preserve manual values across workbook imports and include retention backfill tooling.
Add Cedar Gate model extraction and reports, measured service routes and ground surfaces, plus site-map section totals and quantity refinements.