Munyaka model: 27 stormwater structures and 26 pipes from the issued structure table
(MH/KI/outlet by CAD block), water node points, and the information-stage village network
(services, ponds, boundary, lots, hydrants) aligned from the SDP Rev C PDF.
Map 3: selected Progress section is outlined and its row highlighted; Show-on-map gains
ground surface, contours, kerbs, markings, toes, reserve, signs, studs and HOLD switches;
the ground fades when underground services are ticked; pipes and manholes are chunkier.
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Add planned vs actual turnover dashboards, monthly actual costs, editable retention forecasts and actuals, starting retention, payouts and running balances. Preserve manual values across workbook imports and include retention backfill tooling.
Add Cedar Gate model extraction and reports, measured service routes and ground surfaces, plus site-map section totals and quantity refinements.
Improve workforce scanning, site transfers and timesheet exports.
Audit plant imports, duplicate identities, rates and dashboard totals.
Repair delivery PO selection, periodic rechecks and receiving guards.
Align financial ledgers, supplier periods and mobile layouts.
Add the site map preview, shared theme controls and audit evidence.
Verify 3,455 application tests, six fuel export tests, TypeScript and
an optimized production build. Clean up a leaked test timer and keep
local worktrees and generated reports out of ESLint traversal.
Changed-file lint passes; repository-wide lint retains 33 existing
errors in unchanged files.