Commit graph

6 commits

Author SHA1 Message Date
DEls
8e1cbc8b75 feat(site-map): Munyaka 2 stormwater and village network, Progress section highlight, layer switches
Munyaka model: 27 stormwater structures and 26 pipes from the issued structure table
(MH/KI/outlet by CAD block), water node points, and the information-stage village network
(services, ponds, boundary, lots, hydrants) aligned from the SDP Rev C PDF.

Map 3: selected Progress section is outlined and its row highlighted; Show-on-map gains
ground surface, contours, kerbs, markings, toes, reserve, signs, studs and HOLD switches;
the ground fades when underground services are ticked; pipes and manholes are chunkier.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-28 12:13:38 +02:00
DEls
76d450aa1d chore: site certificates, site spend and cedar-gate model updates
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-27 12:23:34 +02:00
DEls
36da7f9f20 feat(site-model): Nellmapius Ext. 25 roads, kerbs and benchmarks from the 100_ROADS and 400_KERBING drawings
Road areas (5,221 m²) in 20 m sections along the ring roads and the Igwali Street spur, 1.74 km of kerb measured once, stand lines, and the four survey benchmarks with an indicative ground plane. No services or ground levels are placed; the supplied survey and sewer sheets cannot yield them.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-21 05:29:17 +02:00
DEls
5141f7783a feat(site-map): Cedar Gate stormwater and sewer pipes and manholes from the long sections
Extract 23 stormwater structures / 22 pipes and 18 sewer manholes / 17 pipes with sizes, inverts, ground levels and positions from the C3277 long-section tables (superseded sewer copies dropped by matching the issued PDFs). New model folder 2026-10-21. Map 3 draws them as round pipes and manholes, adds status popups for pipes and manholes, and reuses Map 2's services panel; water stays plan routes.

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-21 05:04:42 +02:00
DEls
0dfb129696 feat: update management comparisons and Cedar Gate site model
Add planned vs actual turnover dashboards, monthly actual costs, editable retention forecasts and actuals, starting retention, payouts and running balances. Preserve manual values across workbook imports and include retention backfill tooling.

Add Cedar Gate model extraction and reports, measured service routes and ground surfaces, plus site-map section totals and quantity refinements.
2026-10-20 12:23:44 +02:00
DEls
d66c213712 feat(site-map): model pipeline with 20 m chainage sections 2026-10-14 07:04:34 +02:00